From a 40ft x 9.5ft x 8ft ISO container this was designed as a Low Carbon Emissions Visual Display Unit for Southwark Council and is situated at Elephant and Castle. The shipping container had the following conversions carried out:

  • Overall length reduced to 30ft
  • 26ft x 6ft window
  • Both ends of the unit had triangular steel sections fitted for visual effect
  • The exterior was clad with translucent panels
  • Remote controlled hydraulic door
  • Solar panels were fitted to the roof
  • Astroturf flooring